Update Terakhir : 14 Sep 2015
Daya Terpasang, Produksi, dan Distribusi Listrik PT. PLN
(Persero) pada Cabang/Ranting PLN di Kota Metro, 2010-2014 |
Installed Power, Production, and Distribution of Electricity PT.
PLN (Persero) in Branch/Twig PLN in Metro City, 2010-2014 |
|
|
|
|
|
|
|
Tahun |
Produksi Listrik (kWh) |
Listrik Terjual (kWh) |
Dipakai Sendiri (kWh) |
Dikirim ke Unit Lain (kWh) |
Susut/Hilang (KWh) |
Year |
Production of Electricity |
Electricity Sold |
Used Alone |
Send to Another Unit |
Shrinkage/ Missing |
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
|
|
|
|
|
|
|
2010 |
143.754.368 |
119.426.476 |
805.124 |
11.553.760 |
11.969.008 |
2011 |
142.122.269 |
123.821.495 |
87.494 |
1.397.279 |
16.816.001 |
2012 |
161.044.862 |
144.217.386 |
54.276 |
1.457.632 |
15.315.569 |
2013 |
189.471.911 |
162.560.232 |
252.276 |
11.342.394 |
15.317.009 |
2014 |
195.960.180 |
174.999.222 |
900.258 |
254.321 |
19.806.379 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|